Full refit of a 1962 racing yacht built at Böhling Werft. Comprehensive project covering teak deck, hull and interior.

Work Carried Out
  • Complete overhaul of the teak deck — reuse of the old 20mm teak, planed to 10mm, re-laid with epoxy resin and joints milled
  • Result: completely watertight deck with at least 15 more years of service life
  • Hull stripping back to metal — application of coarse, medium and fine filler, primer and 2K paint
  • Teak interior fit-out: furniture, floors, linings and space organisation
  • Bow cabin painted
Request a quote →
02

Jollenkreuzer

30er · 20er · 15er Restorations
Jollenkreuzer
Jollenkreuzer
Jollenkreuzer
Restoration · Structural Repair · Painting

Complete restorations of three Jollenkreuzers — 30er, 20er and 15er — with structural work and high-precision surfaces.

Work Carried Out
  • 15er: New centreboard case, keel restoration and replacement of frames
  • 20er: Hull reinforcement with 2 layers of plywood at +45° and -45°, 5mm planks vacuum-bonded with epoxy — classic plank-look finish
  • 30er: Reconstruction of the superstructure, deck beams, mahogany window cladding, sealing with linen fabric, caulking of the underwater hull
  • Complete painting of all three boats
Request a quote →
03

Jugendwanderkutter

10-1962 Hull Repair
Jugendwanderkutter
Jugendwanderkutter
Jugendwanderkutter
Structural Repair · Hull

Work carried out in Berlin 2023 for a sailing club. Structural repair to the hull of this classic cutter from 1962.

Work Carried Out
  • Replacement of hull planks
  • Repairs to the inner lining
  • Structural riveting
Request a quote →
04

Teak Decks

New Installation · Restoration
Teak Decks
Teak Decks
Teak Decks
Teak Decks · Installation · Restoration

Two types of work: complete installation of a new teak deck prefabricated in Germany and fitted in Italy, and restoration of an existing teak deck.

Work Carried Out
  • New installation: deck prefabricated in Germany, fitted in Italy without drilling, with epoxy resin and vacuum bonding
  • Restoration: complete milling and re-caulking
Request a quote →
05

Sauna Hall

Joinery in Teak
Sauna Hall
Sauna Hall
Sauna Hall
Joinery · Teak · Installation

Manufacture and installation of a teak wood bench as well as installation of panels and swing door. Work focused on detail precision, material strength and surface quality.

Request a quote →
06

Binne · Hans Pfenning

1979 Stern Restoration
Binne · Hans Pfenning
Binne · Hans Pfenning
Binne · Hans Pfenning
Repair · Heck · 2K painting

Complete stern restoration of this 1979 boat designed by Hans Pfenning, including transom, outboard motor well and stern deck. 2K painting.

Work Carried Out
  • Complete stern restoration including transom
  • Repair Outboard Motor Well
  • Renewal of the stern deck
  • 2K painting